Green Bay, Wisconsin · A Private Proposal
Ref. FDV-GB-001 · Rev. 03 · For Discussion

Token power beneath Lambeau Field.

Frozen Development Ventures proposes to place the compute of the coming decade directly beneath the most storied ground in American sport, without disturbing a single blade of grass above it. The facility operates entirely below grade, is cooled by the climate that made the field famous, and is designed to return more to Green Bay than it draws from it.

44.5013° N, 88.0622° W · Elev. +640 ft · Target depth −40 ft
Zero above-ground footprint
Carbon-negative by design
Ownership: refer to disclosures
NATURAL TURF · UNDISTURBEDFROST LINE −4 FTUTILITY GALLERY · −12 FTCOMPUTE HALL A · −40 FT · 20,000 RACKSCOMPUTE HALL B · −64 FT · 20,000 RACKSACCESS SHAFTSERVICE ENTRY, DISCREETGEOTHERMAL EXCHANGE LOOP · −120 FT · CLOSED CIRCUITDEPTH, FT0−20−40−60−80−100−120THERMAL SINKOCT – APRFROZEN DEVELOPMENT VENTURESDWG FDV-GB-001 · SECTION A–ASCALE: NTS · REV 03DRAWN BY: ——— · CHECKED: ———
Fig. 01 — Section A–A through the playing surface, looking north. Not to scale. Turf shown undisturbed. Subsurface rights: refer to disclosures.
Full specifications→
01 / The Proposal

The most advanced infrastructure in Wisconsin, placed where no one will ever see it.

Frozen Development Ventures proposes to construct a next-generation artificial intelligence data center in the bedrock beneath Lambeau Field. The facility would operate entirely below grade, leaving the ground above untouched for the community that owns it.

Read the vision→
40,000
GPU racks, sub-surface
0 ft²
New above-ground footprint
100%
Geothermal and ambient cooling
1
Storied stadium, preserved

Compute, uninterrupted

A hardened facility engineered for the most demanding training runs, shielded from the elements by forty feet of Wisconsin earth.

Depth as an asset

Below grade, temperature is stable, security is inherent, and the land above remains exactly as the community has always known it.

A respectful addition

No new skyline, no new traffic, no new surface. The stadium stands as it always has, only now it quietly computes.

02 / Environment
−110%

Projected net carbon intensity of the facility, accounting for sequestration, renewables and recovered heat. We prefer to under-promise.

Green in name, green in fact.

We hold ourselves to a standard that would make the most skeptical neighbor nod, slowly, in approval. The environment is not a constraint on our ambition; it is the entire point of it. Sealed cooling, on-site renewables, recovered heat offered to the city at no cost, and a watershed we never touch.

Environmental commitments→
1,200
Projected roles, construction and permanent
400 MW
Renewable capacity under commitment
0.152
Tonnes CO₂e offset since your arrival
03 / Live figures

Figures update continuously. Methodology available in the prospectus, on request, in summary.

04 / Timeline
Full timeline→
2026 · Q3

Proposal published

■ Complete
2026 · Q4

Community listening period

▣ Ongoing
2027 · Q1

Non-invasive geotechnical survey

□ Scheduled
2034

Full operation

□ Planned
05 / Community

For a community that owns its team, a neighbor that keeps to itself.

011,200 roles across construction and operations, with local hiring preferred and documented.
02Recovered heat offered to adjacent municipal and stadium infrastructure at no cost, in perpetuity.
03An annual allotment of 1,000 GPU-hours for every Brown County household, redeemable in person.
Community benefits→
06 / Press
“No comment.”
— Everyone we asked
“A serious proposal from serious people.”
— A person familiar with the matter

Statements, endorsements and the press kit are available to accredited media and to anyone who asks nicely.

Press and endorsements→
07 / Who is behind this

We prefer not to say.

The principals of Frozen Development Ventures have chosen to remain unnamed, a decision we consider a feature rather than an omission. Anonymity keeps the focus on the work, the community, and the certainty that this is the right thing to build.

Principal of record
Available on request. Requests are also available on request.
About the group→Read the disclosures↓
Project Titletown Compute · Full Proposal

Download the full proposal PDF.

Read the complete Project Titletown Compute proposal detailing the conceptual overview, underground engineering, sustainability model, community benefits, and implementation timeline beneath Lambeau Field.

Download the Proposal (PDF)↓
FDV

A property development group proposing a next-generation AI data center beneath Lambeau Field, Green Bay, Wisconsin. Principals: undisclosed.

Download the proposal (PDF)↓
Disclosures

Frozen Development Ventures ("FDV") is a private development group. This site constitutes neither an offer nor a solicitation, and nothing herein has been reviewed, approved or acknowledged by Green Bay Packers, Inc., the City of Green Bay, Brown County, or any person familiar with the matter. Subsurface rights, zoning, and the ownership of the ground beneath Lambeau Field are the subject of ongoing interpretation. All figures are projections, all projections are estimates, and all estimates are offered in good faith by parties who prefer not to be named.

Carbon figures are modelled. Heat recovery is offered, not guaranteed to be accepted. GPU-hour allotments are non-transferable and redeemable in person at a location to be disclosed. The prospectus is delivered at our discretion.

© 2026 Frozen Development Ventures. All rights reserved, including the right to remain unnamed.
Depth −40 ft · Ref. FDV-GB-001 · Rev. 03